WBM - Residential Tower of Infra-Lightweight Concrete

The first design for a high-rise residential building made of Infra-Lightweight Concrete was conceived of in 2013, within the framework of a Berlin Senate Department for Urban Development and Environment workshop process called ‘Urban Living’. Since then, a variation on the original design, with the particularly innovative building material, has been developed for the “Wohnungsbaugesellschaft Mitte” (WBM).

In the immediate vicinity of long, ten-story linear buildings and a twelve-story high-rise residential building (“Plattenbau”) in Friedrichshain, this likewise twelve-story project complements an existing WBM residential area. The approximately 36-meter high-rise will be erected on a surface area of circa 18 x 26.5 meters. A total of 70 apartments will be built – four units on the ground floor will have access to a common garden and all other apartments will have a balcony. 

The contoured, prefabricated walls consist of Infra-Lightweight Concrete, for which expanded clay is used as the aggregate. The 60-centimeter-thick wall elements — unlike in an external wall insulation system — do not require additional insulating materials, making the building material particularly advantageous in terms of fire protection and recyclability. 

Infra-Lightweight Concrete walls do not have to be clad on either the inside or out and, unlike conventional concrete, have an almost soft, warm surface. The high degree of prefabrication and the technically simple construction method, with loadbearing and heat-insulating wall panels, enable a fast and efficient construction process.

Project Information

Architects

Barkow Leibinger, Berlin

Frank Barkow, Regine Leibinger

 

Team

Heiko Krech (Associate), Konrad Scholz (Project Architect), Johannes Beck, Cecilia Fossati, Nicolai Schlapps

 

Program
70 Apartments

Location
Berlin, Germany

Size
5,400 sqm | 58,000 sq ft

 

Construction

Currently in planning

Client
Wohnungsbaugesellschaft Friedrichshain mbH, represented by Wohnungsbaugesellschaft Berlin-Mitte mbH

 

General Planner

Barkow Leibinger

 

Construction Management

Wenzel + Wenzel, Berlin

Structural Engineer

sbp schlaich bergermann partner, Berlin

 

Climate/Energy Design

Transsolar Energietechnik, Stuttgart


HVAC + Electrical Engineering

REESE Ingenieure, Hamburg

 

Building Physics
Horstmann + Berger, Altensteig 


Landscape Architect

capatti staubach, Berlin

 

Elevators

Jappsen Ingenieure, Berlin

 

Fire Protection Consultant

Peter Stanek, Berlin 

Renderings
Ponnie Images + Barkow Leibinger